SYNERGY
UTMKL SPORT GRANDSTAND
SYNOPSIS
This is a design project for the east sport grandstand at UTMKL. This project is completed by four people working in one group. This project has three floors, the ground floor, the first floor, and the second floor. The required roof design for this grandstand is a mid-span cantilever construction. Each group must also plan ahead of time so that the VIP seating platform level can be linked to the terminal/parking building during the P2.1 individual project later.
SITE PLAN
GROUND FLOOR PLAN
PERSPECTIVE VIEW
AXONOMETRIC
FRONT ELEVATION
REAR ELEVATION
ELEVATION
LEFT ELEVATION
RIGHT ELEVATION
PROJECT
YEAR 3 SEMESTER 6